• Careers
  • About GSE
  • Contact Us
  • Search
GSE Solutions
  • Design Engineering
      • Design Engineering
        • Mechanical
        • Electrical & I&C
        • Civil & Structural
        • Fire Protection
        • Simulation-Assisted Design Engineering (SADE)
        • Request Info >
      • Core competencies are engineering, project studies and design modifications, but through alliances with our teaming partners, we offer a myriad of related services.

        Watch Video>

      • For over 50 years GSE’s experienced team has focused on creating innovative ways to meet our customers’ needs using a combination of our industry-leading services and products.

        Learn More>

    • Simulation Solutions
        • Simulation Solutions
          • High-fidelity Simulators
          • Engineering Simulators
          • On-Demand Simulation & Training
          • Generic & Classroom Simulators
          • Second Simulators
          • Simulation-Assisted Design Engineering (SADE)
          • Advanced Modeling
          • Request Info >
        • De-risk Your Nuclear Digital Upgrades: Validate designs early to prevent costly issues, optimize safety and performance, and reduce downtime with SADE. Our experts use high-fidelity simulation to ensure smooth upgrades, accelerate commissioning, and deliver faster ROI—spotting risks before they become problems.

          Learn more

        • Leading in high-fidelity simulation training since 1971, GSE Solutions' broad experience includes 173 nuclear, 208 fossil, and 114 process simulators, showcasing our depth and versatility.

          Watch video

      • Power Generation
          • Power Generation
            • Data Validation & Reconciliation (DVR)
            • Measurement Uncertainty Recapture (MUR)
            • Program Assessment Modeling
            • Analysis & Support
            • Monitoring & Testing
            • Thermal Performance Services
            • Thermal Performance Training
            • Thermal Performance Software
            • Request Info >
          • GSE is helping plants improve their performance using DVR modeling. This method reduces uncertainty surrounding performance monitoring to allow better decision-making.

            Learn more

          • Trust GSE for required certifications for job placement and Continuing Education Units (CEU) for Professional Development Hours (PDH) needed for Professional Engineers.

            View calendar

        • Engineering Programs
            • Engineering Programs
              • ASME Code Programs
              • ASME Section XI Programs
              • Balance of Plant (BOP)
              • Equipment Qualification Programs
              • Regulatory Driven Programs
              • Engineering Programs Training
              • Engineering Programs Software
              • Request Info >
            • Did you know True North Consulting has a new name? It is part of GSE Solutions, Programs & Performance division.

              About GSE

            • Trust GSE for required certifications for job placement and Continuing Education Units (CEU) for Professional Development Hours (PDH) needed for Professional Engineers.

              View calendar

          • License Renewal
              • License Renewal Services
                • License & Subsequent License Renewal
                • Aging Management
                • License & Regulatory
                • Request Info >
              • GSE and Pelican Energy Partners have merged! We are excited about the next phase of GSE and the opportunity to partner with an emerging industry leader.

                Press release >

              • For over 50 years GSE’s experienced team has focused on creating innovative ways to meet our customers’ needs using a combination of our industry-leading services and products.

                Learn More>

            • Consulting
              & Staffing
                • Consulting Services
                  • Thermal Performance Services
                  • Engineering Programs
                  • Simulation Support
                  • Design Engineering
                  • License Renewal
                  • Request Info >
                • GSE has a lot going on. Be sure to follow us on LinkedIn to stay in touch with what’s going on with our people, products and customers!

                  Follow us!

                • GSE offers a wide spectrum of courses specific to the power and energy industry, from engineering, inspection to thermal performance. All our courses are instructed by highly experienced engineering programs subject matter experts.

                  Learn more >

              • Menu Menu
              Home1 / Simulation2 / Is your simulator ready for your gas conversion project?

              Is your simulator ready for your gas conversion project?

              March 16, 2016/in Simulation, Oil & Gas

              The Mercury and Air Toxics Standards (MATS) put forth by the Environmental Protection Agency (EPA) in 2011 is forcing power plants to reduce their emissions of toxic pollutants. For many older coal burning power plants, the cost of air quality control systems (ACQS) is prohibitively high, but maintaining their generating capacity is still crucial. These regulations coupled with predicted continued availability of low-cost natural gas is pushing some coal-burning plants to convert their coal boiler to fire natural gas.

              Is it time to convert from coal to natural gas?

              It might make practical and economic sense to switch from coal to gas. However, changing fuel requires major control system changes and presents significant control and safety logic challenges. Unless you address these factors before startup, the cost of your fuel conversion project in the form of rework, delays, overtime, and unit trips could become much more significant than anticipated.

              How to reduce the downtime and generate revenue more quickly

              Several leading utilities have addressed these concerns by pre-commissioning control system changes with a high-fidelity simulator. While DSC virtual commissioning can help keep your project on track, there are other factors to consider when modifying an existing coal-fired simulator for the new fuel type.

              As a result, you will have to incorporate the following model changes into your simulator:

              1. Gas Supply

              Because you are adding fuel gas, you must install a pressure-reducing valve station and modify the gas supply and vent piping.

              2. Boiler

              Using natural gas as fuel changes the heat absorption characteristics in the boiler and convection pass. Therefore, you must modify the radiation and/or convective area to help achieve proper steam temperatures. You will also need new burners and igniters, and windbox modifications.

              3. Flue Gas Recirculation (FGR)

              You will need an FGR unit to control NOx and steam temperatures by recycling a portion of the flue gas from the economizer outlet back into the windbox. This helps achieve the low emission goals associated with gas plant conversion projects.

              4. Flue Gas System

              Finally, you must modify the air and gas system, forced-draft/induced-draft fan, and other control functions to maintain furnace pressure. These modifications will enable you to meet designed steam temperatures and full boiler output.

              Share this entry
              • Share on LinkedIn
              • Share by Mail
              https://gses.com/wp-content/uploads/2019/11/Blog-Is-your-simulator-ready-for-your-gas-conversion-project-1-400x250-e1576074018406.jpg 249 374 GSE Systems https://gses.com/wp-content/uploads/2024/11/GSE-Solutions_tag.png GSE Systems2016-03-16 15:33:002021-03-24 15:30:19Is your simulator ready for your gas conversion project?

              Categories

              • BOP Blog Series
              • Training Blog
              • EnVision Blog Series
              • Engineering
              • Thermal Performance
              • Nuclear
              • Simulation
              • Thermal/Fossil
              • Oil & Gas
              GSE Solutions
              © 2026. All rights reserved.
              Privacy Policy

              Navigation

              • Careers
              • Contact Us
              • About GSE
              • Follow Us on LinkedIn

              Contact Us

              This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

              This contact form is deactivated because you refused to accept Google reCaptcha service which is necessary to validate any messages sent by the form.
              Link to: It’s time to replace your proprietary plant hardware with new simulation software Link to: It’s time to replace your proprietary plant hardware with new simulation software It’s time to replace your proprietary plant hardware with new simulation... Link to: 7 Reasons a Second Simulator Makes Sense Link to: 7 Reasons a Second Simulator Makes Sense 7 Reasons a Second Simulator Makes Sense
              Scroll to top Scroll to top Scroll to top