• Careers
  • About GSE
  • Contact Us
  • Search
GSE Solutions
  • Design Engineering
      • Design Engineering
        • Mechanical
        • Electrical & I&C
        • Civil & Structural
        • Fire Protection
        • Simulation-Assisted Design Engineering (SADE)
        • Request Info >
      • Core competencies are engineering, project studies and design modifications, but through alliances with our teaming partners, we offer a myriad of related services.

        Watch Video>

      • For over 50 years GSE’s experienced team has focused on creating innovative ways to meet our customers’ needs using a combination of our industry-leading services and products.

        Learn More>

    • Simulation Solutions
        • Simulation Solutions
          • High-fidelity Simulators
          • Engineering Simulators
          • On-Demand Simulation & Training
          • Generic & Classroom Simulators
          • Second Simulators
          • Simulation-Assisted Design Engineering (SADE)
          • Advanced Modeling
          • Request Info >
        • De-risk Your Nuclear Digital Upgrades: Validate designs early to prevent costly issues, optimize safety and performance, and reduce downtime with SADE. Our experts use high-fidelity simulation to ensure smooth upgrades, accelerate commissioning, and deliver faster ROI—spotting risks before they become problems.

          Learn more

        • Leading in high-fidelity simulation training since 1971, GSE Solutions' broad experience includes 173 nuclear, 208 fossil, and 114 process simulators, showcasing our depth and versatility.

          Watch video

      • Power Generation
          • Power Generation
            • Data Validation & Reconciliation (DVR)
            • Measurement Uncertainty Recapture (MUR)
            • Program Assessment Modeling
            • Analysis & Support
            • Monitoring & Testing
            • Thermal Performance Services
            • Thermal Performance Training
            • Thermal Performance Software
            • Request Info >
          • GSE is helping plants improve their performance using DVR modeling. This method reduces uncertainty surrounding performance monitoring to allow better decision-making.

            Learn more

          • Trust GSE for required certifications for job placement and Continuing Education Units (CEU) for Professional Development Hours (PDH) needed for Professional Engineers.

            View calendar

        • Engineering Programs
            • Engineering Programs
              • ASME Code Programs
              • ASME Section XI Programs
              • Balance of Plant (BOP)
              • Equipment Qualification Programs
              • Regulatory Driven Programs
              • Engineering Programs Training
              • Engineering Programs Software
              • Request Info >
            • Did you know True North Consulting has a new name? It is part of GSE Solutions, Programs & Performance division.

              About GSE

            • Trust GSE for required certifications for job placement and Continuing Education Units (CEU) for Professional Development Hours (PDH) needed for Professional Engineers.

              View calendar

          • License Renewal
              • License Renewal Services
                • License & Subsequent License Renewal
                • Aging Management
                • License & Regulatory
                • Request Info >
              • GSE and Pelican Energy Partners have merged! We are excited about the next phase of GSE and the opportunity to partner with an emerging industry leader.

                Press release >

              • For over 50 years GSE’s experienced team has focused on creating innovative ways to meet our customers’ needs using a combination of our industry-leading services and products.

                Learn More>

            • Consulting
              & Staffing
                • Consulting Services
                  • Thermal Performance Services
                  • Engineering Programs
                  • Simulation Support
                  • Design Engineering
                  • License Renewal
                  • Request Info >
                • GSE has a lot going on. Be sure to follow us on LinkedIn to stay in touch with what’s going on with our people, products and customers!

                  Follow us!

                • GSE offers a wide spectrum of courses specific to the power and energy industry, from engineering, inspection to thermal performance. All our courses are instructed by highly experienced engineering programs subject matter experts.

                  Learn more >

              • Menu Menu
              Home1 / BOP Blog Series2 / Multiple Methodologies for Inspection Scope Optimization: Which is right...

              Multiple Methodologies for Inspection Scope Optimization: Which is right for you?

              February 18, 2021/in BOP Blog Series, Engineering, Thermal Performance, Nuclear

              What is the process for performing an Inspection Scope Optimization?
              Inspection Scope Optimization (ISO) for Flow Accelerated Corrosion (FAC) can be performed in several ways. Components are selected from several areas of the FAC program for inspection and different program areas require different approaches. Let’s look at the methodology used for each program area.

              Component Reinspections
              Component reinspections are added to the scope based on remaining service life calculations from a previous inspection. Re-inspections typically comprise the largest portion of the scope, and many of these are scheduled prematurely due to the overly conservative nature of wear calculation methods available to program owners when these evaluations were performed. In recent years, more advanced wear calculation methods have been developed to remove the extra levels of conservatism without increasing risk to the plant.

              During the scope optimization process for re-inspections, the remaining service life calculation from the last inspection is reviewed and, if necessary, recalculated using modern wear calculation methods to ensure the component has the most accurate remaining service life possible. Reinspection evaluations are the source of most inspection deferrals resulting from a scope optimization. Component reinspection reviews are performed for both single-outage and historical scope optimizations.

              New CHECWORKS SFA Inspections
              CHECWORKS™ SFA is software that predicts wear rates in FAC-susceptible components. FAC Program owners use the results to select inspections on previously uninspected components based on the predicted wear rate and time to critical component thickness. The scope optimization process reviews the CHECWORKS SFA Wear Rate Analysis results to verify the necessity of new inspections selected from the model and suggest other locations that may have been overlooked. CHECWORKS SFA inspection reviews are only performed during single-outage scope optimizations due to the frequent recalibration of the model.

              New Susceptible Non-Modeled (SNM) Inspections
              Roughly 60 percent of all FAC-susceptible piping operates under conditions that cannot be modeled using CHECWORKS SFA. Because conditions in these lines can be unpredictable, this group of susceptible piping presents a greater risk of failure.

              The optimization of SNM inspection selection includes comparing the results of past inspections on high-wear lines to determine if further inspections are warranted and determining the risk level of uninspected lines to determine if an immediate inspection is necessary. New SNM inspection reviews are only performed during single-outage scope optimizations due to the industry norm of only planning these inspections one cycle ahead of the outage.

              New Inspections from Operating Experience
              When constructing an FAC inspection scope, it is important to account for plant and industry operating experience. During the scope optimization, recent operating experience is compared with components selected to determine if the new inspections are adequate and necessary. New OE inspection reviews are only performed during single-outage scope optimizations due to the industry norm of only planning these inspections one cycle ahead of the outage.

              Engineering Judgment
              Engineering judgment inspections are often inspired by notification of off-normal conditions in the plant or are simply inspections performed by the FAC program for other programs with a less robust inspection schedule during the outage. As a result, these inspections usually experience little or no change during the scope optimization process. New engineering judgment inspection reviews are only performed during single-outage scope optimizations due to the industry norm of only planning these inspections one cycle ahead of the outage.

              Combination with Critical Thickness Recalculations
              GSE teams are qualified to calculate minimum allowable (critical) component thicknesses for several utilities. Recalculation will often result in a lowering of the critical thickness for a component, extending the life of the component even if the previously calculated wear rate cannot be changed. We estimate that the reinspection deferral rate combining new critical thicknesses and optimized wear calculation methods is 60- 90 percent. Previous critical thickness calculations in your program may not be optimized because of the following:

              • Overly conservative screening criteria: Historically, many sites utilized screening criteria using a standard percentage of the component nominal thickness (e.g. 87.5% or 70%) instead of a formal critical thickness calculation. Oftentimes, this value is never refined before the scheduling of the reinspection, resulting in a premature reinspection and a waste of up to $10,000 for each early inspection. It is also possible that these screening criteria were non-conservative. Several plants in the industry have at least one system that is considered a “low-margin” system. This means the nominal/un-degraded thickness of the pipe is very close to the critical thickness, sometimes even within the manufacturing tolerance, meaning that the slightest wear or manufacturing variance could put the plant in violation of code standards.
              • Outdated material allowable stress values: Newer revisions of the ASME B31.1 piping standard have increased the allowable stresses of several common materials used for piping in power plants. While safety-related piping is tied to the code the plant is licensed, allowable thickness calculations on non-safety-related piping components can be performed without a formal code reconciliation. While a formal code reconciliation has less of an impact on the FAC program due to the small amount of safety-related piping, the impact on other plant programs is significant.

              If you are considering outsourcing your Inspection Scope Optimization, talk with the experts at GSE or visit https://gses.com/balance-of-plant-bop/.

              Share this entry
              • Share on LinkedIn
              • Share by Mail
              https://gses.com/wp-content/uploads/2021/02/BOPBlogSeries-Square_600x600.jpg 600 600 Sunny Demattio https://gses.com/wp-content/uploads/2024/11/GSE-Solutions_tag.png Sunny Demattio2021-02-18 12:50:022023-10-09 15:26:34Multiple Methodologies for Inspection Scope Optimization: Which is right for you?
              You might also like
              The Benefits of Outsourcing Your Inspection Scope Optimization

              Categories

              • BOP Blog Series
              • Training Blog
              • EnVision Blog Series
              • Engineering
              • Thermal Performance
              • Nuclear
              • Simulation
              • Thermal/Fossil
              • Oil & Gas
              GSE Solutions
              © 2026. All rights reserved.
              Privacy Policy

              Navigation

              • Careers
              • Contact Us
              • About GSE
              • Follow Us on LinkedIn

              Contact Us

              This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

              This contact form is deactivated because you refused to accept Google reCaptcha service which is necessary to validate any messages sent by the form.
              Link to: Predicting Wear: How To Use Pass 2 Analysis Link to: Predicting Wear: How To Use Pass 2 Analysis Predicting Wear: How To Use Pass 2 Analysis Link to: The Benefits of Outsourcing Your Inspection Scope Optimization Link to: The Benefits of Outsourcing Your Inspection Scope Optimization The Benefits of Outsourcing Your Inspection Scope Optimization
              Scroll to top Scroll to top Scroll to top